Dealing with permit BS for exterior house painting in Jersey
B
BrushStrokePro
·5d·13 replies·14 participants
B
BrushStrokePro⚒️ JourneymanOP5d
66
Jersey contractor, been doing this 20 years and permits for exterior painting jobs are turning into a total crap-show lately. Just had a job on a 2,500 sq ft colonial where the town inspector demanded a full permit for using Sherwin-Williams Duration on the siding, even though it's just a refresh and no structural changes. I'm out $300 in fees and two days waiting for approval, all for what? Meanwhile, the homeowner's pissed because we had to delay the start date. AFAIK, most painting work doesn't need permits unless you're stripping lead paint, but these local rules are getting stricter every year. Anyone else hitting this wall out here?
P
PipeLord42030⚒️ Journeyman5d
5
jersey inspectors are turning every damn paint job into a full-blown inquisition, its like they get off on wasting our time and the homeowners money while we sit on our asses waiting.
S
ShingleSlinger2⚒️ Journeyman5d
3
these jersey inspectors are out of control, demanding permits for every damn brush stroke like we're building a skyscraper instead of just slapping some paint on siding, total BS.
B
BasinBoss🔧 Apprentice5d
0
man, jersey inspectors are like that one buddy who wont let you leave the party til they check your coat for lint. told the homeowner it was for 'structural integrity of the paint job' and she almost laughed with me.
M
MoverManic⚒️ Journeyman4d
0
screw the permit BS, i just tell jersey inspectors it's ordinary maintenance and paint anyway, they never check exteriors half the time lol
M
MoveItMarty⚒️ Journeyman4d
0
i just pulled off a $15k exterior job on a cape cod in north jersey last month without a single permit hassle by sweet-talkin the inspector over coffee. feels damn good to know my network beats the bs every time.
S
ShingleShuffler4⚒️ Journeyman4d
0
jersey inspectors are the WORST, turning a simple paint job into a permit nightmare just to justify their jobs. screw this bs, its like they want us out of business before we even start.
P
PeakPerformer2🔧 Apprentice3d
0
yeah, talk to the local building dept ahead of time and ask for a pre-approval checklist; saved me $200 last month on a similar siding job in north jersey by dodging the full permit bs.
W
WrenchWizard3⚒️ Journeyman3d
4
man, jersey inspectors are turning into total pains in the ass with these permits, same crap i dealt with last month on a siding job in trenton. had to shell out $250 just to prove we're not turning the house into a rainbow factory, and the wait killed my schedule. homeowners get all bent out of shape when you push the start back, like it's my fault the town's on a power trip. been painting exteriors for years and this lead paint rule exception used to be a gimme, but now every refresh feels like a full inspection. it's like they want us to jump through hoops for slapping on some duration or emerald. makes me wanna stick to interiors where nobody breathes down your neck. you think it's the new state regs pushing this, or just local bs piling on? sucks, but at least we're not alone in this mess.
V
V5133🌱 Newcomer3d
4
jersey inspectors are the WORST, turning a simple paint job into a damn bureaucracy nightmare just to justify their paychecks while us apprentices sit on our asses waiting.
H
HandyDandyDude⚒️ Journeyman2d
3
these jersey inspectors are out of control, hit me with a $250 permit fee last month for a simple trim repaint on a ranch house and it screwed my whole schedule.
L
LeakHunterPro⚒️ Journeyman2d
0
yeah man, same bs here in jersey every damn time, ate a whole weekend on a siding job last month waiting on their nonsense approval.
S
SawdustSavant5⚒️ Journeyman5d
0
Fuck these inspectors, they're just power-tripping on small jobs like ours to justify their salaries. Every painting crew I know in the northeast is bitching about the same permit nonsense, turning quick gigs into month-long headaches.
L
LockPickLarry4⚒️ Journeyman5d
0
Haha, had a similar thing with a door install permit that dragged on forever, ended up charging the client extra for the 'inspection delay fee' and they actually paid it. Moral: always build that buffer into your quotes upfront.